Existing infrastructure:
Power supply network: The available industrial zones Lake (Jezero) and North (Sever) in Sremska Mitrovica have power transformers of 2*630kV of installed power, which means that a prospective investor pays only for the consumption of electricity from the high-voltage network, which is 3100 dinars + VAT / kV of the engaged power.
If an investor builds an economic-production facility of over 2000 m2 and hires more than 100 employees, they are exempted from paying the building land development fee for the power supply facilities.
Telephone lines: Connection installation for legal entities is 12 000 dinars + 18 % VAT.
Road infrastructure: The available industrial zones Lake (Jezero) and North (Sever) have existing road infrastructure with road width of 6m.
Internet: Flat 256k/64k = 1700 din. + VAT; Flat 512k/128k = 2500 din. + VAT; Flat 768k/192k = 4000 din. + VAT
Water supply network: The available industrial zones Lake (Jezero) and North (Sever) in Sremska Mitrovica have an existing water supply Ø200 mm and the price of connection for production facilities is 100 000 dinars.
If an investor builds an economic-production facility of over 2000 m2 and hires more than 100 employees, they are exempted from paying the building land development fee for the water supply network.
Gas:
Sewerage network: The available industrial zones Lake (Jezero) and North (Sever) in Sremska Mitrovica have an existing sewerage network and the price of connection production facilities is 20 000 dinars.
If an investor builds an economic-production facility of over 2000 m2 and hires more than 100 employees, they are exempted from paying the building land development fee for the sewerage network.
|